Method of making a stack of the type comprising a first electrode, an active layer, and a second electrode

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9735361
SERIAL NO

14404695

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making a stack of the type comprising a first electrode, an active layer, and a second electrode, for use in an electronic device, in particular of the organic photodetector type or the organic solar cell type, the method comprising the following steps:

    a) depositing a first layer (2) of conductive material on a substrate (1) in order to form the first electrode;b) depositing an active layer (3) in the form of a thin organic semiconductor layer, this layer including non-continuous zones (30);c) locally eliminating the first conductive layer (2) through the non-continuous zones (30) of the active layer by chemical attack; andd) depositing a second layer (4) of conductive material on the active layer (3) in order to form the second conductive electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVESPARIS FRA PARIS PARIS
ISORG17 RUE SOYOUZ LIMOGES CEDEX 3 87068

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Charlot, Simon Grenoble, FR 7 14
Verilhac, Jean-Marie Grenoble, FR 16 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00