System and method for state-transition-controlled processing of objects

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9734469
SERIAL NO

14038470

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device and method for state-transition-based processing of objects following a state-structured process flow with a plurality of process states. For each process state one or more tasks are selected in order to process the transition of a selected object from one process state to the subsequent process state. State parameters of the selected object are captured and the current process state of the object is determined based on the captured state parameters. The tasks are generated for a specific process state in dependence on assigned task parameters of a process task. Operating tags are assigned to a process task and include dynamically alterable operating parameters adding operational constraints to the processing of the process task. The state-structured process flow is dynamically generated and processed by triggering defined threshold and/or trigger values and/or steering the processing of the process tasks based on the operating parameters of the operating-tags.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SWISS REINSURANCE COMPANY LTD8022 ZÜRICH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wedl, Boris Zurich, CH 4 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00