Field unit and a method for operating an automation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9734114
APP PUB NO 20150169493A1
SERIAL NO

14405458

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A field unit with a bus node which is designed for signal conversion between an external bus protocol and an internal bus protocol for communication with at least one function module, in such a way that a sequential transmission of data packets is made along an internal bus system and also including function modules which are designed for processing of data packets and for signal transmission with at least one downstream function component wherein the bus node is so designed for a differentiation of data packets of the higher-level control device that in the bus node a processing of non-safety-related data packets to the internal bus system and onwards transmission of safety-related data packets to the internal bus system is effected, and wherein at least one function module connected to the internal bus system is designed as a safety module for processing of safety-related data packets.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FESTO SE & CO KGRUITER STRASSE 82 ESSLINGEN 73734

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gehrke, Martin Weinstadt, DE 19 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00