Adjustable ergonomic keyboard

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9733722
SERIAL NO

14156922

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An input system includes a first base portion and a second base portion that each include a keying surface. A base portion manipulation mechanism couples the first base portion to the second base portion. The base portion manipulation mechanism includes a moveable coupling that is configured to allow relative movement of the first base portion and the second base portion into at least one of a tented orientation and a splayed orientation. A locking mechanism provides a biasing force that causes an engagement between portions of the moveable coupling that resists relative movement of the first base portion and the second base portion absent an unlocking force, wherein the locking mechanism is responsive to the unlocking force that overcomes the biasing force to allow relative movement of the first base portion and the second base portion into the at least one of the tented orientation and the splayed orientation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KEY OVATION, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Linegar, Chris Sydney, AU 19 135
Norwalk, Mark Austin, US 19 135

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00