Redundant pressure control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9732723
SERIAL NO

14768638

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electricity generating device comprising a housing; a first lobed rotor and a second lobed rotor rotatably arranged in a fluid passage enclosed by the housing such that the lobes of the first and the second lobed rotor intermesh to create a barrier between a high-pressure and a low-pressure side of the housing during operation of the device; a first electricity generator to which the first lobed rotor is coupled, the first electricity generator being capable of varying the load of the first lobed rotor; and a second electricity generator to which the second lobed rotor is coupled, the second electricity generator being capable of varying the load of the second lobed rotor. There is also provided a method of synchronizing rotational positions of a first lobed rotor coupled to a first electricity generator and a second lobed rotor connected to a second electricity generator in a turbine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENERGREEN AS4068 STAVANGER

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Orke, Per Reidar Hafrsfjord, NO 2 146

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00