Solid metal alloy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9732401
SERIAL NO

14358689

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention addresses the problem of providing a novel, sold metal alloy. Provided is a metal alloy containing two or more types of metal, wherein an equilibrium diagram of the metal alloy shows the two or more types of metal in a finely mixed state at the nanolevel in a specific region where the two types of metal are unevenly distributed. This metal alloy has a substitutional solid solution of the two or more types of metal as the principal constituent thereof. This metal alloy is preferably one obtained by precipitation after mixing ions of two or more types of metal and a reducing agent in a thin-film fluid formed between processing surfaces, at least one of which rotates relative to the other, which are arranged so as to face one another and are capable of approaching and separating from one another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
M TECHNIQUE CO LTDIZUMI-SHI OSAKA 594-1144

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Araki, Kazuya Izumi, JP 6 55
Enomura, Masakazu Izumi, JP 124 456
Honda, Daisuke Izumi, JP 90 300
Maekawa, Masaki Izumi, JP 25 139

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00