Honeycomb core, method of producing a honeycomb core, and sandwich panel comprising a honeycomb core
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Aug 15, 2017
Issued Date -
N/A
app pub date -
Nov 7, 2011
filing date -
Nov 9, 2010
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A honeycomb core having a lattice structure which includes a resin-impregnated matrix, a method for producing such a honeycomb core, a sandwich panel having such a honeycomb core, and use of such a honeycomb core or such a sandwich panel in automobile construction. The matrix is impregnated inhomogeneously with the resin.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
MAGNA STEYR FAHRZEUGTECHNIK AG & CO KG | 8041 GRAZ |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Dietz, Wolfgang | Pirching, AT | 28 | 209 |
# of filed Patents : 28 Total Citations : 209 | |||
Krammer, Christoph | Deutschlandsberg, AT | 8 | 45 |
# of filed Patents : 8 Total Citations : 45 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 2 Citation Count
- B32B Class
- 31.67 % this patent is cited more than
- 8 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Feb 15, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Feb 15, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
