Apparatus and method for monitoring signal quality of a modulated optical signal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9729244
APP PUB NO 20160112138A1
SERIAL NO

14518262

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transmitter with at least one optical modulator adapted to modulate the optical signal output by a laser source to generate a modulated optical signal, wherein the optical signal output by the laser source is tapped and supplied to a monitoring circuit comprising an optical front end configured to select signal components of the tapped modulated optical signal and to convert the selected signal components of the tapped modulated optical signal into analog signals, and comprising at least one analog-to-digital converter, ADC, adapted to perform equivalent-time sampling of the analog signals to provide digital signals processed by a processing unit to monitor signal quality of the modulated optical signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADTRAN NETWORKS SEFRAUNHOFERSTRASSE 9A MARTINSRIED 82152

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alfiad, Mohammad Duluth, US 5 35
Tibuleac, Sorin Johns Creek, US 21 206

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00