Area-delay-power efficient multibit flip-flop

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9729128
SERIAL NO

14682413

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-bit flip-flop (MBFF) includes a plurality of 1-bit flip-flops, each having an input data selection circuit that receives a data signal and a scan data signal. The MBFF also includes a local signal generation circuit that receives a global clock signal and a global scan enable signal, and in response, provides local control signals, wherein each of the local control signals is generated in response to both the global clock signal and the global scan enable signal. The local control signals are provided to the input data selection circuits, and exclusively control the input data selection circuits to route either the input data signal or the scan input data signal as a master data bit, reducing transistor requirements. Local clock signals may be generated by the local signal generation circuit in response to the global clock signal, and may exclusively control data transfer within the flip-flops, improving setup time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYNOPSYS INC690 EAST MIDDLEFIELD ROAD MOUNTAIN VIEW CA 94043

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Reddy, Basannagouda Somanath Cupertino, US 5 22
Srivastava, Manish Bangalore, IN 44 404

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00