Inverter for an electric motor or generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9729092
APP PUB NO 20160149525A1
SERIAL NO

14900145

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An inverter for an electric motor or generator having a first device and a second device mounted on an element. The first device includes a first switch, a first contact arranged to be coupled to a first terminal of a power source, and a second contact. The second device includes a second switch, a third contact arranged to be coupled to a second terminal of a power source, and a fourth contact. The first device and the second device are mounted on the element such that a portion of the first contact of the first device that is arranged to be coupled to the first terminal of a power source and a portion of the third contact of the second device that is arranged to be coupled to second terminal of a power source are located adjacent to each other on a first region of the element and the second contact of the first device and the fourth contact of the second device are arranged to be coupled to a coil winding of the electric motor or generator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PROTEAN ELECTRIC LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Owen, Geoffrey Farnham, GB 7 78

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00