Method, computer program product and controller for starting-up a switched reluctance motor, and electrical apparatus implementing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9729088
SERIAL NO

14785672

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of starting-up a switched reluctance, SR, motor is provided. The method comprises simultaneously energizing a plurality of phases at a first time point with respective phase voltages that are substantially the same, until the motor rotor is stabilized in alignment with either one of the plurality of phases; simultaneously de-energizing the plurality of phases at a second time point that follows the first time point; monitoring a decrease of respective phase currents in the plurality of phases from a third time point that follows the second time point by a first predetermined time interval; determining a phase of alignment of the rotor using evaluation of the decrease of the phase currents following simultaneous de-energizing of the plurality of phases; and, initiating rotation of the rotor from the determined phase of alignment of the rotor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NXP USA INC6501 WILLIAM CANNON DRIVE WEST AUSTIN TX 78735

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grasblum, Pavel Frenstat Pod Radhostem, CZ 4 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00