Photovoltaic system maximum power point tracking

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9727072
SERIAL NO

14003578

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Photovoltaic system maximum power point tracking methods and apparatus are disclosed. Output power samples from one or more photovoltaic (PV) cells are obtained. The output power samples include perturbed samples for which a perturbation is applied to an operating voltage or current of the PV cell(s) and non-perturbed samples for which no perturbation is applied to the operating voltage or current. A control output, to change the operating voltage or current of the PV cell(s) for a next perturbed sample by a next perturbation, is generated. The next perturbation could be based on an estimated change in output power due to a previous perturbation. The next perturbation could also or instead be in a direction based on a change in output power samples, and of a magnitude based on the direction and a direction of perturbations applied for one or more perturbed samples preceding the next perturbed sample.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLANTRO SEMICONDUCTOR CORP146 COLONNADE RD SUITE 200 OTTAWA K2E7Y1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lipan, Tudor Ottawa, CA 16 132

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00