Stabilized ICP emission spectrometer and method of using

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9726611
APP PUB NO 20150276611A1
SERIAL NO

14668480

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ICP emission spectrometer is schematically configured to include an inductively coupled plasma generation unit, a light condensing unit, a spectroscope, a detector, and a controller. The detector includes a photomultiplier and has a detector controller and an input unit. The photomultiplier has voltage dividing resistors, which make an amplification factor not to become constant immediately due to a change in an application voltage applied to the photomultiplier, but the detector controller controls an idle voltage and an idle voltage application time so that a multiplication factor becomes constant, during a period from when analysis conditions are input to the input unit in advance until a sample containing an analysis-targeted element is introduced into the inductively coupled plasma generation unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI HIGH-TECH SCIENCE CORPORATION24-14 NISHI-SHIMBASHI 1-CHOME MINATO-KU TOKYO 105-0003

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakagawa, Yoshitomo Tokyo, JP 23 293

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00