Internal combustion engine control apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9726140
SERIAL NO

14617343

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An internal combustion engine control apparatus includes: an ignition coil including a primary coil and a secondary coil that are magnetically coupled to each other; a first switch element for turning on and off a current to the primary coil; and a spark plug, for igniting an air-fuel mixture in an internal combustion engine by using a spark discharge caused by switching the first switch element from the ON state to the OFF state. The internal combustion engine control apparatus is configured to: determine occurrence of one of an abnormality in a discharge voltage and a misfire of the spark plug, when the calculated time duration in which a voltage of the primary coil after the switching of the first switch element from the ON state to the OFF state is above a predetermined comparison reference voltage does not fall within an allowable range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Okuda, Hiroshi Tokyo, JP 120 995

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00