Rotor high-and-low pressure power apparatus and working method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9726046
APP PUB NO 20170051633A1
SERIAL NO

15307834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rotor high-and-low pressure power apparatus, comprises a heat collector, an insulating pipe, a gasification reactor, an atomizer, a cylinder, a triangular rotor, an inner gear ring, a gear, an output shall, a one-way an intake valve, a liquid storage tank, a pressure valve, an insulating layer, an automatic exhaust valve, a housing, a heat sink and an exhaust control valve. The triangular rotor is arranged within the housing. The inner gear ring and the gear matching with the inner gear ring are arranged at the center of the triangular rotor. The gear is fixed on the output shaft. The triangular rotor divides the cylinder into three independent and equal sections. The gear ratio of the inner gear ring and the gear is 3:2. The rotor provided with a rotor engine works three times per rotation. The ratio of horsepower to volume is high.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUO YUANJUNYONGZHOU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guo, Yuanjun Yongzhou, CN 8 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00