Flow deflector arrangement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9726030
SERIAL NO

14459820

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flow deflector arrangement is used in combination with a pipe arrangement secured through a component, the flow deflector arrangement comprising: a nut to secure the pipe arrangement to the component, and a shroud for attachment to the component so as to extend at least partially around the pipe arrangement when the pipe arrangement is secured to the component by the nut. The nut has an outwardly directed flange to adopt a position spaced from the component, and the shroud defines at least one deflector surface which, when the shroud is attached to the component, extends away from the component in spaced relation to the pipe arrangement. The flange and the deflector surface cooperate in deflecting a flow of fluid flowing from the component and along the outside of the pipe arrangement such that the flow is deflected generally outwardly from the pipe arrangement with a degree of swirl.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROLLS-ROYCE PLCLONDON LONDON LONDON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Feaver, Oliver George Louth, GB 2 12
Mullender, Andrew James Derby, GB 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00