Hydraulic circuit for construction machine and control device for same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9725884
SERIAL NO

14525322

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydraulic circuit of a construction machine including center bypass passages, into which a pressurized oil from hydraulic pumps is supplied, includes a directional control valve group in tandem with the center bypass passages; a bleed-off valve on a downstream side of each center bypass passage; and a merging circuit that merges the pressurized oil supplied into one center bypass passage and that in another center bypass passage, wherein each directional control valve includes a first internal passage that flows the pressurized oil into the center bypass passages, and a second internal passage that supplies the pressurized oil to a hydraulic actuator, wherein the center bypass passages and the first internal passage form a parallel passage, wherein an opening area of the bleed-off valve is changed, wherein the merging circuit includes a merging directional control valve that controls an inflow direction of the pressurized oil to be merged.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO(S H I ) CONSTRUCTION MACHINERY CO LTDJAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hashimoto, Hirofumi Chiba, JP 21 218

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00