Machine power control with ratio increase

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9725883
SERIAL NO

12371692

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system for a machine having a power source configured to provide power, a number of implements including a work implement, configured to provide operations, and a number of power transmitting paths configurable to selectively make power available to the implements to perform operations. The control system may include a control arrangement configured to regulate the power source to provide a first level of available power, to configure a first power transmitting path to make a percentage A1 of said first level of power available to provide a first operation, and to configure a second power transmitting path to make a percentage A2 of said first level of power available to provide a second operation, at least the second operation being a work operation. The control arrangement may further be configured to increase said first level of available power of said power source to a second level of available power, to configure the first power transmitting path to make a percentage B1 of said second level op power available to provide said first operation, and to configure the second power transmitting path to make a percentage B2 of said second level of power available to provide said second operation, such that the ratio B2/B1 is greater than the ratio A2/A1.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CATERPILLAR INC100 NE ADAMS STREET PEORIA IL 61629

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Drake, Benjamin D East Peoria, US 4 14
Lange, Philip F Washington, US 5 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00