Kerosene base material production method and kerosene base material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9725665
APP PUB NO 20140305839A1
SERIAL NO

14007722

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing a kerosene base fuel according to the present invention comprises removing paraffins having carbon number of 7 or less from a first fraction having an initial boiling point of 95 to 140° C. and a final boiling point of 240 to 280° C. obtained from a hydrotreated oil of a Fischer-Tropsch synthetic oil to obtain a second fraction having a content of paraffins having carbon number of 7 or less of 0.1 to 0.7% by mass.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COSMO OIL CO LTD1-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 105-8528
JAPAN OIL GAS AND METALS NATIONAL CORPORATION2-10-1 TORANOMON MINATO-KU TOKYO 105-0001
JX NIPPON OIL & ENERGY CORPORATIONCHIYODA-KU TOKYO 100-8162
JAPAN PETROLEUM EXPLORATION CO LTDTOKYO JAPAN
INPEX CORPORATION5-3-1 AKASAKA MINATO-KU TOKYO 107-6332
NIPPON STEEL & SUMIKIN ENGINEERING CO LTD5-1 OSAKI 1-CHOME SHINAGAWA-KU TOKYO 141-8604

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Niitsuma, Takuya Tokyo, JP 10 108

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00