Integrated multistage supercritical technology to produce high quality vegetable oils and biofuels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9725664
SERIAL NO

14225615

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generation system, which includes a source of a seed oil, a source of alcohol, and a reactor in communication with the source of seed oil and the source of alcohol. The reactor produces a biofuel product. The system has a power source that operates on a biofuel energy source to produce heated exhaust and is in communication with the reactor to utilize a portion of the biofuel product as its biofuel energy source. The system has a heat transfer mechanism that transfers heat from the exhaust manifold to the reactor. The power source also converts mechanical power into electrical power. Also disclosed is a system that involves extraction of oil from an oilseed product. A method of extracting oil from an oilseed product, a method of making a transesterified seed oil, and a method of making a biofuel are also disclosed, as are products obtained thereby.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYRACUSE UNIVERSITY304 LYMAN HALL SYRACUSE NY 13224

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anitescu, Gheorghe Syracuse, US 3 13
Tavlarides, Lawrence L Fayetteville, US 21 170

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00