Braking systems for railway cars

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9725102
APP PUB NO 20160229429A1
SERIAL NO

14619772

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Braking systems for railway cars are provided. A braking system defines a longitudinal axis, and includes a first brake assembly, a second brake assembly, and an actuator operable to generate a linear force, the actuator disposed proximate the second brake assembly. The braking system further includes a movable rod and a fixed rod extending between the first brake assembly and the second brake assembly. In some embodiments, the braking system further includes a lever and a slack adjuster disposed proximate the first brake assembly, the slack adjuster connected to the first brake assembly and the lever and operable to adjust a distance along the longitudinal axis between a reference point of the first brake assembly and a pivot point of the lever. In some embodiments, the braking system includes a strut connected to the second brake assembly, the actuator, fixed rod and movable rod connected to the strut.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AMSTED RAIL COMPANY, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sunde, Jonathan Greenville, US 21 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00