Speed control for working vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9725090
APP PUB NO 20160031443A1
SERIAL NO

14806021

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A speed control device in a traveling work vehicle changes a speed of rotational drive power from an engine to drive vehicle wheels and includes: a target speed calculator determining a target speed, based on operation deflection of a speed change device. A vehicle speed controller adjusting a speed change ratio based on the target speed. A vehicle speed obtainer obtaining an actual vehicle speed. A forcible target speed modifier forcibly modifying the target speed to a lower speed based on operation of a braking device. A release can treat an operation of the speed change device as a trigger to cancel the target speed forcibly modified by the forcible target speed modifier, and conforming the target speed to the actual vehicle speed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KUBOTA CORPORATION1-2-47 SHIKITSUHIGASHI NANIWA-KU OSAKA-SHI OSAKA 5568601 JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Komatsu, Shigeru Osaka, JP 53 786
Takahashi, Keiji Osaka, JP 96 1024

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00