Hybrid type construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9725008
SERIAL NO

13128256

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid-type construction machine includes: a motor generator system connected to an internal combustion engine and performing a motor generator operation; an electric power accumulation system connected to the motor generator system; a load drive system connected to the electric power accumulation system and being driven electrically; an abnormality detection part equipped to the motor generator system, the electric power accumulation system and the load drive system; and a main control part determining whether an abnormality has occurred based on a detection value of the abnormality detection part. When the abnormality determination part determines that an abnormality has occurred, the main control part stops a drive of a drive system in which the abnormality is detected in the load drive system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO HEAVY INDUSTRIES LTDTOKYO JAPAN TOKYO METROPOLIS
SUMITOMO(S H I) CONSTRUCTION MACHINERY CO LTD1-1 OSAKI 2-CHOME SHINAGAWA-KU TOKYO 141-6025

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanbayashi, Hideaki Kanagawa, JP 5 105
Takanashi, Kyoko Kanagawa, JP 4 52
Wu, Chunnan Kanagawa, JP 36 229

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00