Gap control device for pilger die assembly of cold pilger mills

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9724739
APP PUB NO 20150306647A1
SERIAL NO

14526588

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gap control device for a Pilger die assembly of cold Pilger mills. The gap control device can independently control the height of a pair of bearing blocks which axially support an upper die. A lower plate has first and second receiving holes which respectively correspond to the upper portions of a pair of bearing blocks. First and second wedge plates are fitted into the receiving holes, and respectively have inclined surfaces on the upper portions thereof. First and second adjustment blocks respectively have inclined guide surfaces to be in surface contact with the inclined surfaces of the wedge plates, and are movable horizontally with respect to the lower plate. An upper plate is assembled to the upper portion of the lower plate to cover the adjustment blocks. First and second adjustment bolts allow the first and second adjustment blocks to be respectively manipulated in a horizontal direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KEPCO NUCLEAR FUEL CO LTD242 DAEDEOK-DAERO 989BEON-GIL YUSEONG-GU DAEJEON 305-353

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Yong Shin Daejeon, KR 3 19
Hwang, Ho Yeon Daejeon, KR 3 0
Kim, In Kyu Daejeon, KR 50 831
Park, Ki Bum Daejeon, KR 23 49
Shin, Jung Cheol Daejeon, KR 5 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00