Swirler elements for nozzles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9724709
APP PUB NO 20150048183A1
SERIAL NO

14161974

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A swirl element for swirling fluid in a nozzle has a swirler body. The swirler body defines a feed channel including an axially oriented channel surface and a swirl chamber in fluid communication with the feed channel. The swirl chamber defines a radially oriented swirler surface substantially normal to the channel surface. The swirl chamber and the axially oriented channel are in fluid communication through a tangential slot for imparting swirl on fluids passing from the feed channel into the swirl chamber. The tangential slot includes a smoothly rounded surface transitioning from the channel surface to the swirler surface for providing a smooth, substantially separation free transition in fluid flow from the channel into the swirl chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DELAVAN SPRAY LLC4334 MAIN HIGHWAY BAMBERG SC 29003

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Prociw, Lev A Johnston, US 71 320
Smith, Neil Lancashire, GB 135 2452
Whittaker, Frank Cheshire, GB 8 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00