Metamaterial antenna

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9722319
APP PUB NO 20140292615A1
SERIAL NO

14353028

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to a metamaterial antenna, where the metamaterial antenna includes an enclosure, a feed, a first metamaterial that clings to an aperture edge of the feed, a second metamaterial that is separated by a preset distance from the first metamaterial and is set oppositely, and a third metamaterial that clings to an edge of the second metamaterial, where the enclosure, the feed, the first metamaterial, the second metamaterial, and the third metamaterial make up a closed cavity; and a central axis of the feed penetrates center points of the first metamaterial and the second metamaterial; and a reflection layer for reflecting an electromagnetic wave is set on surfaces of the first metamaterial and the second metamaterial, where the surfaces are located outside the cavity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KUANG-CHI INNOVATIVE TECHNOLOGY LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ji, Chunlin Shenzhen, CN 44 143
Liu, Ruopeng Shenzhen, CN 134 821
Yang, Qing Shenzhen, CN 496 9882
Yue, Yutao Shenzhen, CN 19 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00