Method for manufacturing termination structure of semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9722035
APP PUB NO 20160380061A1
SERIAL NO

15259054

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A termination structure of a semiconductor device is provided. The semiconductor device includes an active area and a termination area adjacent to the active area, in which the termination area has the termination structure. The termination structure includes a substrate, an epitaxy layer, a dielectric layer, a conductive material layer and a conductive layer. The epitaxy layer is disposed on the substrate and has a voltage-sustaining region. The voltage-sustaining region has trenches parallel to each other. The dielectric layer is disposed in the trenches and on a portion of the epitaxy layer. The conductive material layer is disposed on the dielectric layer in the trenches. The conductive layer covers the trenches, and is in contact with the conductive material layer and a portion of the epitaxy layer, and is electrically connected between the active area and the termination area. A method for manufacturing the termination structure is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUPER GROUP SEMICONDUCTOR CO LTDHSINCHU COUNTY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Yuan-Ming Taichung, TW 14 15
Yeh, Chun-Ying Hsinchu, TW 19 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00