Method for decontamination of an object

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9721689
APP PUB NO 20160172064A1
SERIAL NO

14969866

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object to be decontaminated contaminated with radioactive material, e.g., contaminated soil or water, is introduced into eluting solvent and dissolved, and the radioactive material is separated from the object to be contaminated by elution of the radioactive material into the eluting solvent. The eluting solvent containing the radioactive materials dissolved therein and the object to be decontaminated are separated into solid and liquid. The soil after solid-liquid separation and from which the radioactive material is removed is collected, and the eluting solvent after solid-liquid separation and a separated liquid containing contaminated water are introduced into an electrolysis tank and electrolyzed. Metal ions such as those of the radioactive materials are deposited on the cathode in the electrolysis tank. Hydrogen containing tritium generated in electrolysis is collected in the electrolysis tank. The hydrogen is moved to the outside of the electrolysis tank and trapped.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MORITA MIYATA CORPORATIONSHIBA 256 SQUARE BLDG 8F 5-6 SHIBA 2-CHOME MINATO-KU TOKYO 105-0014
YOSHIDA HIDEO2-9-2 MATSUGAOKA TOKOROZAWA-SHI SAITAMA 359-1132

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Suyama, Yasuhiro Higashimurayama, JP 4 5
Yoshida, Hideo Tokorozawa, JP 223 3948

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00