Method for optimizing the flexible constraints of an electric power system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9720431
SERIAL NO

14470504

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for optimizing the flexible constraints of an electric power system includes a step S1 of expressing the total power generation cost of the electric power system by using the sum of quadratic functions of active power outputs of all generator sets in the system and constructing an objective function, a step S2 of selecting a multi-dimensional flexible optimization model or a flexible power generation cost optimization model according to the practical situation of the electric power system and the practical purpose of optimization, a step S3 of determining the operating conditions of the electric power system, and a step S4 of carrying out load flow calculation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHANGHAI JIAO TONG UNIVERSITY200240 NO 800 DONGCHUAN ROAD SHANGHAI MINHANG DISTRICT SHANGHAI CITY SHANGHAI CITY 200240

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Duan, Jianmin Shanghai, CN 11 198
Li, Hongzhong Shanghai, CN 4 18
Liu, Yong Shanghai, CN 1235 24302
Sun, Weiqing Shanghai, CN 9 15
Wang, Chengmin Shanghai, CN 3 17
Xiao, Dingyao Shanghai, CN 1 14
Yi, Tao Shanghai, CN 13 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00