Grain-drying facilities

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9719722
SERIAL NO

14352051

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides grain-drying facilities which can effectively use the heat energy of biomass combustion hot-air that has been generated in a biomass combustion furnace. The grain-drying facilities 1 include: a biomass combustion furnace 3 provided with a heat exchanger 24 for generating a hot air from a combustion heat of a biomass fuel and an outside air which has been taken in from the outside; and a circulation type grain-drying apparatus 2 provided with a grain-drying portion 7 to which the hot air that has been generated in the biomass combustion furnace 3 is supplied through a pipe 15 for supplying a hot air, wherein the circulation type grain-drying apparatus 2 has a plurality of warming pipes 6a in the grain-drying portion 7, and an exhaust hot-air is supplied to the warming pipes 6a from the biomass combustion furnace 3 through a pipe 11 for supplying the exhaust hot-air.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SATAKE CORPORATIONCHIYODA-KU TOKYO 101-0021

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujitomo, Hirota Tokyo, JP 2 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00