Power transmission apparatus for vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9719592
APP PUB NO 20150167806A1
SERIAL NO

14553373

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power transmission apparatus for a vehicle may include a first input shaft adapted to selectively receive torque of an engine, a second input shaft disposed without rotational interference with the first input shaft, a third input shaft disposed in a row with the second input shaft and without rotational interference with the first input shaft, a planetary gear set including a first rotation element, a second rotation element directly connected to the third input shaft, and a third rotation element directly connected to the first input shaft, a motor/generator directly connected to the first rotation element, a first speed output unit adapted to convert torque input from the second input shaft or the third input shaft and output the converted torque, and a second speed output unit adapted to convert torque input from the second input shaft or the third input shaft and output the converted torque.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797 06797

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Kyeonghun Seoul, KR 57 563
Lee, Suengho Seoul, KR 11 126
Park, Jongsool Hwaseong-si, KR 139 1850

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00