Locomotive control system having thermal management

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9719434
SERIAL NO

14630534

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system for a machine having an engine, a first alternator, a second alternator, and an aftertreatment system is disclosed. The control system may include a sensor associated with the aftertreatment system and configured to determine a temperature of exhaust passing through the aftertreatment system, and a controller in communication with the sensor and connectable to the first and second alternators. The controller may be configured to determine an available power output of the first alternator, determine a load increase of the engine needed to raise the temperature of the exhaust to an operating temperature of the aftertreatment system, and selectively connect the first alternator to a power consumer to achieve the load increase when the available power output of the first alternator is greater than the load increase. The controller may be further configured to selectively connect the second alternator to the power consumer to achieve the load increase when the available power output of the first alternator is less than the load increase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PROGRESS RAIL LOCOMOTIVE INC9301 WEST 55TH STREET LAGRANGE IL 60525

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Biagini, Douglas Michael Washington, US 7 33
Hawkins, William Charles Plainfield, US 5 37
Kral, John Franklin Plainfield, US 11 57

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00