Charging device for internal combustion engines

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9719413
APP PUB NO 20150292398A1
SERIAL NO

14434144

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A charging device for internal combustion engines includes a compressor part configured to compress drawn-in combustion air. The compressor part is arranged in an intake line of the internal combustion engine and is connected to the internal combustion engine via an actuatable mechanical coupler. An expansion part is disposed in a circulation system for a circulating working medium. The circulation system includes at least one exhaust-gas heat exchanger and a circulation pump such that the expansion part is driven utilizing waste heat from the internal combustion engine. An electric machine is connected to the expansion part so as to drive the compressor part. The electric machine is connected to the compressor part. An operational electric connection is disposed between the electric machine and a battery so that electric energy is stored during an energy-recovery mode or else so that electric energy is provided to drive the electric machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IAV GMBH INGENIEURGESELLSCHAFT AUTO UND VERKEHRCARNOTSTRASSE 1 BERLIN 10587

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ambrosius, Volker Radebeul, DE 1 2
Dingel, Oliver Chemnitz, DE 2 4
Neukirchner, Heiko Chemnitz, DE 11 54
Semper, Torsten Dresden, DE 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00