Double pinch criterion for optimization of regenerative rankine cycles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9719379
SERIAL NO

14749399

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods axe disclosed herein that generally involve a double pinch criterion for optimization of regenerative Rankine cycles. In some embodiments, operating variables such as bleed extraction pressure and bleed flow rate are selected such that a double pinch is obtained in a feedwater heater, thereby improving the efficiency of the Rankine cycle. In particular, a first pinch point is obtained at the onset of condensation of the bleed and a second pinch point is obtained at the exit of the bleed from the feedwater heater. The minimal approach temperature at the first pinch point can be approximately equal to the minimal approach temperature at the second pinch point. Systems that employ regenerative Rankine cycles, methods of operating such systems, and methods of optimizing the operation of such systems are disclosed herein in connection with the double pinch criterion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MASSACHUSETTS INSTITUTE OF TECHNOLOGY77 MASSACHUSETTS AVENUE CAMBRIDGE MA 02139

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mitsos, Alexander Lexington, US 6 30
Zebian, Hussam Cambridge, US 11 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00