Method of producing structure for producing casting, and structure such as mold

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9719211
APP PUB NO 20150361619A1
SERIAL NO

14758131

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method of producing a structure for producing a casting, including: a process (I) of obtaining a slurry composition containing an organic fiber, an inorganic fiber, a thermosetting resin, and water; a process (II) of obtaining a fiber laminate by subjecting the slurry composition to papermaking; and a process (III) of dehydrating the fiber laminate and thereafter drying the resultant, in which the process (I) includes a process (I-1) of beating a mixture containing the organic fiber and water, a process (I-2) of mixing the mixture obtained in the process (I-1) and water, and a process (I-3) of mixing the mixture obtained in the process (I-2) and the inorganic fiber, the thermosetting resin is mixed in at least any of the process (I-1), the process (I-2), and the process (I-3), and an average fiber length of the inorganic fiber in the structure for producing a casting is 1 mm or longer and 5 mm or shorter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KAO CORPORATIONTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikenaga, Haruki Toyohashi, JP 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00