Gas generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9719062
SERIAL NO

13936130

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first system includes a feedstock load port and a feedstock discharge port. The first system also includes a tank configured to retain biomass feedstock for aerobic biodegradation. The first system further includes a mechanical ventilator in fluid communication with the tank. The mechanical ventilator is configured to supply air to facilitate the aerobic biodegradation of the biomass feedstock. The first system also includes an exhaust port configured to receive gas generated during the aerobic biodegradation. A second system includes a feedstock load port and a feedstock discharge port. The second system also includes a pressure vessel configured to retain biomass feedstock for anaerobic biodegradation. The second system further includes a gas release device to facilitate migration of gas within the pressure vessel. The second system also includes a water cycler configured to cycle water within the pressure vessel. The second system further includes an exhaust port.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUTECH VENTURES2021 TRANSFORMATION DRIVE SUITE 2220 LINCOLN NE 68508

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Haorong Omaha, US 8 204
Yu, Daihong Omaha, US 2 0
Yu, Yanshun Nanjing, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00