Overmolding with non-oriented fibers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9718932
SERIAL NO

14914863

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process is provided for overmolding an insert or substrate with non-oriented thermoplastic fibers present in an amount that allows them to thermally bond in the presence of non-oriented filler fibers. The thermoplastic fiber fusion retains the filler fibers within the insert upon cooling. The filler fibers are selected to modify the properties of the insert and an overmolded article formed with the insert therein. Such overmolded articles are used in applications including vehicle components such as automotive interior light bases, posts, undercar components, cross members, chassis components, and frame components; architectural components such as home door interiors, sound damping panels, and weather resistant wood replacement. Articles formed with the inventive process yield weight reductions compared to conventional insert overmoldings, along with low scrap generation, process flexibility with respect to part shape and fiber material. Improved recyclability and reduce costs are realized with the inclusion of natural fiber fillers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEIJIN AUTOMOTIVE TECHNOLOGIES INC255 REX BLVD AUBURN HILLS MI 48326

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guha, Probir Kumar Bloomfield Hills, US 50 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00