Method for manufacturing a covering structure for a tubular package and said package, covering structure and package

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9718574
APP PUB NO 20130200138A1
SERIAL NO

13759715

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for manufacturing a covering structure for a cardboard package comprising a tubular body made up a cardboard material. The covering structure comprises a flat assembly of three materials: (1) a cellulosic material covered with a reactivatable barrier material over the face thereof oriented towards a safety membrane, making up a lid cardboard, (2) a laminating part arranged between said lid cardboard and the safety membrane, with a shape conjugated to the shape of the opening of the tubular body, made from paper, or paper whereof the face oriented towards said lid cardboard is coated with a material having barrier and sealing properties, and (3) a safety membrane, made up of a paper coated with at least one reactivatable barrier material on the surface thereof not oriented towards the laminating part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIREIX GEORGES68400 RIEDISHEIM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sireix, Georges Riedisheim, FR 8 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00