Composite knife

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9718197
SERIAL NO

14545834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite knife made from layers of Metal Matrix Composite (MMC) is disclosed. It includes a middle layer of fibrous preform including a hard insert placed longitudinally at its periphery. The hard insert, after sharpening, represents the cutting blade portion of the composite knife. The composite knife further includes a carrier which forms the load bearing member of the cutting blade, as well as forming the integral handle of the composite knife. The carrier portion of the composite knife includes at least one top and at least one bottom layers of fibrous preform, sandwiching the middle layer that contains the cutting edge portion of the knife. A metallic material is infiltrated within the fibrous preforms and extends throughout the composite blade structure forming the MMC knife, the metallic material bonding the middle layer within the carrier, and bonding the top and bottom surface of the hard insert within the carrier.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CPS TECHNOLOGIES CORPNORTON MA

International Classification(s)

loading....
  • 2015 Application Filing Year
  • B26B Class
  • 306 Applications Filed
  • 232 Patents Issued To-Date
  • 75.82 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances201520162017201820192020202120220255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adams, Richard Bolton, US 86 801
Sorensen, James Eagan, US 5 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • B26B Class
  • 0 % this patent is cited more than
  • 8 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges78237229101 - 1011 - 2021 - 3031 - 40020406080100120140160180200220240260

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029