Solid STTE power controller with parallel MOSFET load sharing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9716385
APP PUB NO 20150364922A1
SERIAL NO

14305690

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid state power control (SSPC) controls flow of current from a power bus to an inductive load. The SSPC utilizes load sharing, in which a plurality of current supply paths are connected in parallel to control and share the flow of current between the power bus and the inductive load. Each current supply path includes a main power switching field effect transistor (FET); a balance resistor, and a secondary FET. The balance resistor is connected between the main FET and the load. The secondary FET shunts the balance resistor when the main FET is turned on, and allows current flow through the balance resistor during a turn-off time of the main FET. The balance resistor modulates gate-source voltage of the main FET in order to compensate for gate-source threshold differences among the main FETs that could lead to unequal current sharing during the turn-off period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAMILTON SUNDSTRAND CORPORATIONFOUR COLISEUM CENTRE 2730 WEST TYVOLA ROAD CHARLOTTE NC 28217-4578

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dickey, John A Caledonia, US 62 343

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00