Offset leadframe cascode package

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9716057
SERIAL NO

15245382

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite semiconductor device, such as a high-voltage cascode, is constructed in a single package by mounting a first die on a first planar substrate and second die mounted on a second planar substrate, where the substrates are separated by a gap filled with a dielectric encapsulant. The substrates may be separated both vertically and as well as laterally, to lie in different parallel planes. The substrates are in a leadframe that also includes interconnections, heat sinks, package pins, and removable tie-bars, forming a contiguous metallic structure. Multi-device frames containing multiple leadframes joined by additional tie-bars may be used to process multiple composite semiconductor devices together in, e.g., step-and-repeat wire and die bonding processes and batch encapsulation molding batch processes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNITED SILICON CARBIDE INC7 DEER PARK DRIVE SUITE E MONMOUTH JUNCTION NJ 08852

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bhalla, Anup Princeton Junction, US 325 5864
Zhang, Hao Plainsboro, US 1170 5565

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00