Method for energizing a superconducting magnet arrangement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9715958
SERIAL NO

14799582

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for charging a magnet arrangement having a superconducting tape conductor with a first transition temperature in a cryostat device. The magnet arrangement is temperature-controlled to a first pre-operating temperature between the first transition temperature and the operating temperature, a first pre-operating current is excited, the magnet arrangement is cooled to operating temperature and a first operating current is excited. The magnet arrangement has a second magnet winding composed of a second superconductor material with a second transition temperature above the operating temperature and at least 15 K below the first transition temperature, wherein a second operating current in the second magnet winding is excited at the latest after cooling of the magnet arrangement to the operating temperature, and with the second operating current the second magnet winding generates a second operating magnetic field in the volume of the first magnet winding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRUKER SWITZERLAND AGINDUSTRIESTRASSE 26 8117 FÄLLANDEN 8117

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schauwecker, Robert Zurich, CH 37 219
Vonlanthen, Patrik Schwerzenbach, CH 7 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00