Selectively connectable softside shelter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9714523
APP PUB NO 20170058556A1
SERIAL NO

15248749

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector for interlocking structures includes a first Y-shaped connector affixed to a portion of a first structure, a second Y-shaped connector affixed to a portion of a second structure. A loop-type engaging element is mounted on one of: (i) the inner faces of both the first and second arms of each of the first and second Y-shaped connectors; (ii) the outer faces of both the first and second arms of each of the first and second Y-shaped connectors. A hook-type engaging element mounted on the other of: (i) the inner faces of both the first and second arms of each of the first and second Y-shaped connectors; (ii) the outer faces of both the first and second arms of each of the first and second Y-shaped connectors. Each of the first and second Y-shaped connectors is selectively configurable to either a male configuration or a female configuration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HDT EXPEDITIONARY SYSTEMS INC30500 AURORA ROAD SOLON OH 44139

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hicks, Steven Waynesboro, US 24 173
Lilly,, II Curtis G Fishersville, US 1 13
Smiley, Angela Goshen, US 1 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00