Railroad tie and railroad comprising such a railroad tie

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9714486
APP PUB NO 20160194834A1
SERIAL NO

14654972

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A railroad tie (1) is manufactured from at least plastic (2), wherein an elongated reinforcing structure (3) is embedded in the plastic. The reinforcing structure in the longitudinal tie direction (L) is extending at least from and including at least a part of one (15) of the two rail supporting longitudinal tie segments up to and including at least a part of the other (16) of the two rail supporting longitudinal tie segments of the railroad tie. In the two rail supporting longitudinal tie segments the railroad tie has a lower lateral stiffness than in an intermediate longitudinal tie segment (17), lying in-between the two rail supporting longitudinal tie segments, which lower lateral stiffness is realized at least by change of shape of the elongated reinforcing structure in the longitudinal tie direction and/or by the range within which said reinforcing structure extends in the longitudinal tie direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LANKHORST ENGINEERED PRODUCTS B V8607 AD SNEEK

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Van, Belkom Arnoldus Spannum, NL 9 111

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00