Method for manufacturing polymer composition and the polymer composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9714338
APP PUB NO 20150197630A1
SERIAL NO

14410843

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object of the present invention is to provide a polymer composition having properties resembling those of natural rubber, e.g. good durability (fracture resistance, wear resistance, and crack growth resistance), and a method for manufacturing the polymer composition. Specifically, the present invention provides a method for manufacturing a polymer composition including a mixture of polyisoprene and polystyrene/polybutadiene, comprising: polymerizing styrene monomer or butadiene monomer in the presence of a catalyst to synthesize polystyrene or polybutadiene; adding isoprene monomer to the polystyrene or polybutadiene thus synthesized, to synthesize polyisoprene and thus generate said mixture, wherein content of the styrene monomer or the butadiene monomer is set to be 10 mol % or less with respect to the total quantity of the styrene monomer/the butadiene monomer and the isoprene monomer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BRIDGESTONE CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kaita, Shojiro Tokyo, JP 56 296
Matsushita, Junko Tokyo, JP 51 227
Tamaki, Satoru Tokyo, JP 21 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00