Method for producing rubber wet masterbatch, rubber wet masterbatch, and rubber composition including rubber wet masterbatch

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9714325
APP PUB NO 20140249252A1
SERIAL NO

14350309

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a rubber wet masterbatch includes a solidifying step of mixing a slurry solution containing a filler and a dispersing solvent with a rubber latex solution, and solidifying the resultant mixture to produce a filler-containing rubber solidified product, a dehydrating step of using a first uniaxial extruder to dehydrate the filler-containing rubber solidified product while the solidified product is heated into the range of 100 to 180° C., thereby producing a rubber wet masterbatch, and a drying plasticizing step of using a second uniaxial extruder to plasticize the rubber wet masterbatch while the masterbatch is heated into the range of 120 to 180 C, thereby producing the rubber wet masterbatch further decreased in water content by percentage. The method does not have cooling step between the dehydrating step and the drying plasticizing step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYO TIRE & RUBBER CO LTD2-2-13 FUJINOKI ITAMI-SHI HYOGO 664-0847

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyasaka, Takashi Osaka, JP 28 203

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00