Zero voltage switching energy recovery control of discontinuous PWM switching power converters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9712055
SERIAL NO

14919571

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Buck and boost power converter topologies and methods of converting power are provided. One method provides switching power conversion circuitry including an inductor and switches and clamp circuitry connected across the inductor. Control circuitry operates the switches and the clamp circuitry in a series of converter operating cycles which may include: (a) an energy transfer interval for transferring energy input to output via the inductor; (b) an energy recovery phase, during which the inductor current oscillates transitioning from substantially zero to a negative value, from the negative value to a positive value, and from the positive value toward zero; and (c) a clamp phase, during a portion of which the clamp circuitry is ON, energy is trapped in the inductor, the inductor current is negative, and is not zero at the end of the clamp phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PICOR CORPORATION51 INDUSTRIAL DRIVE NORTH SMITHFIELD RI 02896

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clarkin, John Coventry, US 3 123
Swartz, Chris R South Kingstown, US 1 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00