Algorithm for passive power factor compensation method with differential capacitor change and reduced line transient noise

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9712048
SERIAL NO

14781040

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A computer-implementable control algorithm that measures: 1) the reactive power; 2) the power factor; 3) the voltage; and 4) the line frequency. The algorithm calculates the differential compensation capacitance required that is either positive (capacitance to be added), or negative (capacitance to be removed). The new compensation capacitance is calculated from the sum or difference of the differential compensation capacitance and the current compensation capacitance. The algorithm compares the capacitor switching bit pattern for the current compensation capacitance and the capacitor switching bit pattern for the new compensation capacitance, and selects a capacitor switching bit map accordingly. The capacitor switch combination for the new compensation capacitance is switched in incrementally according to the capacitor switching bit map. To reach the selected capacitor switch combination, only one switch is switched at a time to minimize the line transient noise. This part of the algorithm continues to run until the PF is corrected, with the capacitor switches being switched on/off each delayed by a millisecond interval to minimize line transient noise.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POWER QUALITY ENGINEERING LIMITED10TH PLAZA 168 168 DES VOEUX ROAD CENTRAL HONG KONG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Stewart, Neal George Hong Kong, HK 24 344

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00