Apparatus and method for controlling overcurrent of grid-connected inverter due to abnormal grid voltage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9712043
APP PUB NO 20160126828A1
SERIAL NO

14899015

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for controlling overcurrent of a grid-connected inverter due to an abnormal grid voltage includes a grid voltage sensor configured to sense a grid voltage according to an output current of the grid-connected inverter, a voltage variation calculator configured to calculate a D-axis voltage and a Q-axis voltage of the grid voltage to obtain variation values of the D-axis voltage and the Q-axis voltage, and an output current controller configured to determine whether at least one of the D-axis voltage variation value and the Q-axis voltage variation value exceeds a set value of the grid voltage variation, and decrease the output current by a predetermined value when one of the D-axis voltage variation value and the Q-axis voltage variation value exceeds the set value of the grid voltage variation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA FUEL CELL CO LTDGYEONGSANGBUK-DO 37948

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Ju Young Pohang-si, KR 3 3
Kim, Jae Sig Cheongju-si, KR 3 3
Lee, Jeong Heum Pohang-si, KR 13 21
Lee, Jin Su Pohang-si, KR 38 512
Moon, Sang Ho Pohang-si, KR 21 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00