Bypass apparatus for converter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9712042
APP PUB NO 20160197547A1
SERIAL NO

14758022

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides an apparatus for bypassing a phase current from a malfunctioning sub module in a converter. The converter includes multiple sub modules each having an energy storage unit, and at least one power semiconductor circuit which is connected in parallel to the energy storage unit and which includes a power semiconductor switch and free-wheeling diodes, wherein the sub modules are connected in series to each other. The bypass apparatus for a converter according to the present invention comprises: a vacuum switch tube for disconnecting between a first connection terminal and a second connection terminal of a malfunctioning sub module upon the occurrence of a malfunction in a specific sub module and bypassing a phase current from said malfunctioning sub module; and a control device for controlling the operation of the vacuum switch tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYOSUNG HEAVY INDUSTRIES CORPORATION119 MAPO-DAERO MAPO-GU SEOUL 04144

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Jong Yun Hwaseong-si, KR 6 24
Park, Jung Soo Seongnam-si, KR 65 344
Yang, Hang Jun Seoul, KR 4 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00